Tuesday, June 5, 2012

My EE journey in Government...Energy Commission II

1. My first two immediate jobs that I need to continue when I moved to the newly formed 2-staff EE unit in the end of 2007 were the processing the application for fiscal incentives on EE projects and products and soon after that, I was instructed to prepare the implementation strategy and plan for the enforcement of the new Efficient Management of Electrical Energy Regulations which finally was gazetted on 15 December 2008. 

2. Not long after that, the Budget Speech for the year 2009 added one more challenging test for me where suddenly the fiscal incentives for EE was extended to more products approved by Energy Commission effective from 31 August 2008.

3. In the end of 2007 and early 2008, I spent a lot of time asking people who were in-charge of every previous tasks under the disbanded EE department. It became more challenging because most of all the detailed documents and information were not at one place in  dedicated files. The handing over notes that I received was very brief an I had  to meet and speak personally to individuals who are in various department to get the whole picture on the historical information and progress of each tasks.

Incentives for EE Projects and Products
4. When I tried to understand to whole process of the EE& RE incentives application, the procedure required me to perform the assessment of each application  and later to call for a committee to present the initial assessment and later to call pre-selected applicants  for a presentation. There were brief guidelines prepared for potential applicants but most of the applications received were not following it and I had to contact each applicant personally asking about information and data required for the the initial assessment.

5. We received all sorts of application which some of them were quite difficult the EE element that qualify them for the incentives mainly due to lacking of EE related key information and data for proposed EE projects and products.

6. To improve this and to save more time  to assess each application, I drafted the evaluation guidelines for EE project and products with the intention to upload it the public domain in our website and to be circulated to other agencies such as MIDA and KeTTHA  for their information and reference. I tried to impart and integrate my knowledge and real life experiences in EE projects and products in the guidelines and in the same time not to make it too difficult for potential applicants.

7. Below are the two guidelines which finally approved by the management and later published and promoted to the interested parties.

for EE Projects

 
GUIDELINES ON THE INFORMATION REQUIRED FOR
 THE TECHNICAL EVALUATION OF ENERGY EFFICIENCY PROJECTS 

Please attach the information with completed MIDA’s application form. The information to be submitted may vary depending on the type/complexity/scale of the projects.  Kindly contact Energy Commission at Tel: 03-2612 5400/554/536 or Fax   03-26912654 should there be any query.

PART A : TYPE OF  PROJECT
·      Modification/improvement of existing equipment/systems or
·      Introduction/replacement of high efficient technologies or systems.

PART B : GENERAL INFORMATION OF THE PLANT/EQUIPMENT 
 AND ITS ENERGY CONSUMPTION
1 .Name and location.
2. Types of energy supplied.
3. Tariff/rates applied (fuel, electricity).
4. Energy consumption per year such as electricity and fuel.
5. Plant/equipment energy performance such as   efficiency level and etc.

 

PART C : INFORMATION ON THE ENERGY EFFICIENCY PROJECT/EQUIPMENT
1. Description on the equipment/system technologies to be applied.
2. Operational principles/systems applied to improve efficiency and to save  energy.
3. A schematic drawings/diagrams showing the facilities, equipment and processes involved.
4. Equipment/System Information:
  • Product description
  • Brand and model name
  • Supplier
  • Imported/local sources
  • Rated capacity and efficiency level
5. Energy efficiency/energy performance  standard referred.
6. Testing standard used  and its test reports.
7. Function of each equipment contributing to increase its efficiency and to save energy.
8. Comparison of technical and efficiency  data between existing or conventional plant /equipment and proposed plant/equipment.

PART D : ENERGY CONSERVATION POTENTIALS
1. Types of energy to be saved.
2. Comparison of energy consumption data between existing or conventional plant /equipment and proposed  plant/equipment.
3. Method and data used in energy saving the calculations.
4. Estimated energy savings from electricity and/or fuel consumption in energy units.

PART E : IMPLEMENTATION PLAN
1. Who will be involved in the implementation of the project (i.e. Internal personnel/external)
2. Brief description on steps to be taken to implement the project and the targeted duration for implementation.

PART F : COSTS OF THE PROJECT
1.  The total costs and itemized cost for each equipment involved.
2.  Estimated  energy costs to be saved and returns of the investment for the project (i.e. Simple Payback Period, IRR)

For EE Products

 
GUIDELINES ON THE INFORMATION REQUIRED FOR THE
 TECHNICAL EVALUATION OF ENERGY EFFICIENCY AND RENEWABLE ENERGY PRODUCTS FOR IMPORTERS AND LOCAL MANUFACTURERS


PART A :TYPE OF APPLICANT

1. Producer/Manufacturer  Or
2. Authorised Agent/Distributor/Importer/APVSP(for PV systems)

PART B :  INFORMATION OF ENERGY EFFICIENT EQUIPMENT/APPLIANCE/MATERIAL

1. Product Description
2. Brand and Model
3. Energy Efficiency Rating
4. Energy Efficiency Reference Standard Used
5. Testing Standard Used
6. Producer/Manufacturer
7. Product Application

PART C :   SUPPORTING DOCUMENT/INFORMATION

1. Letter/Certificate of  authorization to produce/manufacture
2. Letter/Certificate  as  authorized importer/agent/distributor
3. Confirmation on energy efficiency
  • Test Certificate/Report from accredited lab.


Kindly contact Energy Commission at Tel: 03-2612 5536/32 or
Fax   03-26912654 should there be any query.

8. When I started for EE products, I found out only 2 types of products already had their EE criteria and labeling scheme  to be classified  as energy efficient products.

9. I was in tremendous pressure when manufacturers for other type of products already called  us to apply for incentives since the Budget 2009 speech clearly stated that the effective date was on 31 August 2008 and we only knew about it on the day  the budget speech  read by the PM. This has led me to rush quickly to request for more information from MoF and MIDA before I can start to answer queries with regard to the incentives.

10. What I did finally with all the updated information was, told the manufacturers and importers that we just knew about it  and need some time to prepare the criteria to qualify products covered under the budget speech. I invited them together with other relevant industrial & Professional organizations such as FMM,MEADA, and MASHRAE and also SIRIM to assist me to develop and agree on EE Criteria to be established for each type of products because that was the only way for them to enjoy the incentives at soonest possible.

11. Working Groups  were formed to look after each type of product and I personally chaired each of them and acted as the desk officer too  for each group who compiled and analyzed all information and data to be discussed in the scheduled meetings. 
There were days we had to have 3 meetings for different groups in a day  and finally some products were able to be qualify in stages from early 2009.

12. From 2 type of products in August 2008, within 6 months, we already had 8 types can be classified as energy efficient and manufacturers  were able to apply to enjoy the incentives. All can be done and we did it by working hand in hand with everyone.

13. With the published guidelines on our website, I had better time to explain to questions related to EE incentive application and asked them to the evaluation criteria for application purposes. This has made the processing smoother and faster because almost all key information and data were already available when application received instead to chase them to submit it previously.

14. On top of that, I had the chance to share the latest updates on the incentive application procedure and evaluation criteria personally too as guest speakers to events such as talks and briefing in seminar, dialogues and forum for different target groups organized internally and by other related  parties.

Briefing on EE Incentives Application & Evaluation Process

The Implementation Plan for Efficient Management of Electrical Energy Regulations

15. This regulation has a long and personal historical link to my career from the beginning.Finally, it was about to be gazetted and I was instructed to prepare the overall implementation plan which to be presented to the ministry for approval before the  effective date.

16. This was the most challenging of all the tasks assigned to me in EE Unit. I really had to dig deep from many references and utilizing all that I have in me as EE practitioner in the market previously and later my involvement in regulatory works in the legal department. All that knowledge and hands-on experiences helped me a lot because literally no one has ever implemented this type of regulations in Malaysia to refer. References from success stories and obstacles in implementing this type of law in countries such as Japan and India also helped me a lot in coming up with the plan for Malaysia.

17. Below are the my initial checklist that I personally developed on my own for the early stage of preparing the plan ( at this time there were still only me and my clerk in the unit).

PERINCIAN PERSEDIAAN YANG DIPERLUKAN UNTUK PERLAKSANAAN PERATURAN-PERATURAN PENGURUSAN TENAGA ELEKTRIK DENGAN CEKAP 2008



PERKARA


TINDAKAN/MAKLUMAN
1
Perlaksanaan berdasarkan peruntukan-peruntukan  dalam peraturan
·         Sediakan draf flowchart
2
Peraturan 6 :Pemberitahuan oleh Suruhanjaya
·         Draf notis pemberitahuan kepada pepasangan


3
Peraturan 7 : Obligasi pemegang lesen persendirian/pengguna

Mengemukakan maklumat-maklumat  seperti yang dikehendaki  dalam Peraturan 6 berkenaan:-

i)              Dasar
ii)             Matlamat
iii)            Akaun/maklumat






·         Menyediakan garis panduan skop dasar , matlamat dan akaun/maklumat yang dikehendaki
4
Peraturan 11 : Pendaftaran pengurus tenaga elektrik
i)              Proses permohonan – flowchart
ii)             Buku panduan


·         Sediakan draf flowchart
·         Draf kandungan buku panduan pendaftaran

5
Peraturan 12 : Kehendak kelayakan

i)              Syarat-syarat kelayakan
23 tahun ke atas , warganegara Malaysia

·         Jurutera profesional
6 bulan pengalaman kerja dalam pengurusan tenaga elektrik dengan cekap

·         Ijazah sains, kejuruteraan, senibina atau setaraf
1 tahun pengalaman kerja dalam pengurusan tenaga elektrik dengan cekap

·         Jurutera Perkhidmatan Elektrik(JPE)/Jurutera Elektrik(JEK) Kompeten
9 bulan pengalaman kerja dalam pengurusan tenaga elektrik dengan cekap



·         Pengetahuan berkenaan Akta dan Peraturan

ii)             Temuduga

















 ·         Untuk JPE, laporan projek/tugasan   berkenaan pengurusan tenaga dengan cekap merupakan salah satu keperluan  yang perlu dipenuhi sebelum pendaftaran diluluskan oleh ST(Peraturan 46(2)(a), PPE 1994). Peruntukan yg sama ada untuk JEK tetapi tidak dilaksanakan lagi



·    Kriteria penilaian pengalaman kerja dalam pengurusan tenaga elektrik dengan cekap
·    Kriteria penilaian dalam temuduga
·    Pemilihan dan perlantikan ahli panel penemuduga
·    Buku panduan  skop pengetahuan dan  pengalaman kecekapan tenaga dan perundangan yang  berkaitan untuk rujukan bakal pemohon

6
Peraturan 13 : Permohonan pendaftaran

iii)            Fi
Jadual pertama
Perwakilan kuasa untuk menerima fi oleh pejabat kawasan

iv)            Borang – maklumat dan dokumen sokongan yang diperlukan





·         Draf surat perwakilan kuasa


·         Draf borang permohonan
7
Peraturan 14 : Pengeluaran perakuan pendaftaran

i)              Sijil perakuan pendaftaran





8
Peraturan 15 : Keterangan perubatan kesihatan pemohon
i)              Dokumen pengesahan keterangan perubatan


9
Peraturan 16 : Fungsi dan kewajipan pengurus tenaga elektrik berdaftar

i)              Mengaudit



ii)             Menasihati pemegang lesen

iii)            Memantau keberkesanan

iv)            Menyelia penyimpanan rekod pengurusan tenaga elektrik dengan cekap

v)             Mempastikan pengguna/pemengang lesen mengemukakan laporan dalam Peraturan 6 dalam tempoh seperti dalam Peraturan 7.



·         Panduan komponen-komponen utama dalam laporan audit
·         Definisi/penerangan/skop audit tenaga yang dimaksudkan.




· Panduan jenis-jenis rekod yang dikehendaki

Skop tugas
i)      Makluman kepada pengguna/pemegang lesen terlibat
ii)     Pendaftaran









iii)    Penerimaan bayaran fi

iv)    Borang laporan  setiap enam bulan daripada pengguna/pemegang lesen.







·         Edaran borang permohonan
·         Penerimaan borang permohonan
·         Proses borang permohonan
·         Panggilan temuduga
·         Jalankan temuduga
·       Daftarkan dan maklumkan calon yang  lulus permohonan
·         Keluarkan sijil kelulusan pendaftaran




·    Semakan dan penilaian laporan
·     Kriteria penilaian
·   Tindakan jika terdapat ketidakpatuhan

Below is the initial implementation timeline for the implementation of the regulations


18. There were only two of us in the unit and I strongly believe we have accomplished something very significant and satisfying for the whole year. I must thank everyone who was there to assist and support me all the way and that gave more motivation that  I can contribute more in EE for the country.

19. 2008 was the first full year for me doing EE works in Energy Commission and what I had accomplished did make more inspired to go further.

20. I hope to have the time to share some significant events that led to my involvement in the preparation of the National EE Master Plan way back when it started from 2008 and below are the summary  of key activties reported to the management for that year.


RINGKASAN LAPORAN  AKTIVITI TAHUNAN UNIT DEMAND SIDE MANAGEMENT 2008

 1.    Peraturan-Peraturan  Pengurusan Tenaga Elektrik Dengan Cekap 2008.
Unit DSM telah menyediakan pelan tindakan untuk melaksanakan Peraturan-Peraturan  Pengurusan Tenaga Elektrik Dengan Cekap telah diwartakan dan dikuatkuasakan  pada 15 Disember 2008.
Di antara perkara-perkara yang telah dijalankan ialah penyediaan  perincian pelan tindakan dan penyediaan keperluan-keperluan  untuk pelaksanaan  peraturan tersebut seperti sistem pendaftaran, borang, kriteria pemilihan pengurus tenaga, penilaian laporan dan lain-lain lagi.

2.    Kumpulan Kerja Untuk Menetapkan Kriteria dan Standard Rujukan Kecekapan Tenaga
Beberapa kumpulan kerja  untuk bahan dan kelengkapan cekap tenaga telah ditubuhkan untuk tujuan  pemberian insentif kecekapan tenaga  kepada pengimport dan pengeluar tempatan seperti yang telah diumumkan  di dalam Bajet 2009.

Kumpulan-kumpulan kerja berkenaan telah ditubuhkan dengan  disertai oleh wakil-wakil pengeluar, SIRIM, PTM, FMM dan pertubuhan-pertubuhan profesional dan industri yang berkaitan dan di antara objektif utama penubuhannya ialah:
  • Mengesyorkan  kriteria prestasi kecekapan tenaga standard rujukan yang boleh digunapakai;
  • Menetapkan syarat-syarat pengujian untuk pengesahan kriteria prestasi tenaga yang telah ditetapkan;
  • Menyediakan sistem penarafan untuk menilai prestasi kecekapan tenaga bahan/kelengkapan tertentu.
Kumpulan kerja yang ditubuhkan untuk bahan dan kelengkapan  berikut:
i)  Bahan Penebat;
ii) Kipas domestik;
iii)Penyaman Udara;
iv)Lampu;
v) Televisyen

3.    Insentif  Kecekapan Tenaga.
i)     Proses permohonan insentif.
Unit DSM telah memproses sejumlah 22 permohonan insentif kecekapan tenaga. Permohonan insentif berkenaan adalah merangkumi permohonan pengecualian cukai jualan dan duti import, permohonan sebagai status perintis dan juga elaun cukai pelaburan. Unit DSM  bertanggungjawab sebagai Urusetia untuk Jawatankuasa Penilaian Teknikal Untuk Insentif Kecekapan Tenaga  dan menjalankan  proses penilaian teknikal untuk setiap permohonan.

ii)   Unit DSM juga telah menjadi ahli jawatankuasa kumpulan kerja yang ditubuhkan oleh Kementerian Tenaga, Air dan Komunikasi untuk menyediakan buku panduan permohonan insentif kecekapan tenaga dan tenaga boleh diperbaharui untuk rujukan pihak industri.

4.    Penarafan Prestasi Kecekapan Tenaga Untuk Peti Sejuk
Unit DSM telah memproses dan meluluskan 13 permohonan pengeluar  untuk mendapatkan penarafan STAR untuk peti sejuk berdasarkan prestasi kecekapan tenaga. Sebanyak dua belas model peti sejuk telah mendapat kelulusan  dengan penarafan 5 STAR dan satu model mendapat penarafan 3 STAR.

5.    Promosi Dan Kempen
i)  Unit DSM telah menjadi ahli jawatankuasa pemandu  Kempen Kesedaran Kecekapan Tenaga Nasional  dan  Bulan Tenaga 2008 di peringkat Kementerian Tenaga, Air dan Komunikasi. Pelancaran kedua-dua program tersebut telah diadakan pada bulan November 2008.

ii)  Taklimat dan ceramah kecekapan tenaga seperti  berikut telah disempurnakan oleh Unit DSM.
· Workshop on EE & RE Handbook for Fiscal Incentives  anjuran Kementerian Tenaga, Air dan Komunikasi;
· Workshop On High Efficiency Motors anjuran Pusat Tenaga Malaysia;
· Kempen Kecekapan Tenaga Dan Keselamatan Elektrik  anjuran pejabat Kawasan Suruhanjaya Tenaga Ipoh.
· Kursus Polisi dan Aplikasi Kecekapan Tenaga anjuran Jabatan Pengairan dan Saliran;
·  Seminar Kecekapan Tenaga anjuran TNB Kuantan; dan
· Seminar Kecekapan Tenaga Dan Keselamatan Elektrik Untuk Kakitangan Pihak Berkuasa Tempatan  Selangor anjuran pejabat Kawasan Suruhanjaya Tenaga Petaling Jaya.

 6.    Pembangunan Kakitangan
 Penyertaan di dalam program berikut:
i)   Training Program on Renewable Energy and Energy Efficiency anjuran Technical Energy Research Institute(TERI)  dan Kementerian Luar India  di TERI di Gual Pahari dan  Bangalore,India;
At TERI Gual Pahari, India
ii) Training Program on  Energy Conservation for Malaysia anjuran Kementerian Ekonomi, Perdagangan  dan Industri Jepun di  Energy Conservation Centre, Tokyo,Jepun;
At AOTS-Kita-senju Tokyo
iii)   Logical Framework Analysis  Workshop on Building Energy Efficiency anjuran JKR dan UNDP di Kuala Lumpur;
iv) National Photovoltaic Conference anjuran Pusat Tenaga Malaysia dan UNDP di Putrajaya; dan
v)  Seminar On Promotion Of Energy Efficiency And Conservation (PROMEC) for Buildings  anjuran Pusat Tenaga Malaysia  dan EISD/PROMECC 2008 di Seri Kembangan.


No comments: